CN

Training content

  • Maintenance content
    1. Training on the use and operation of testing machines
    2. Training on testing method standards, testing machine standards, and testing machine calibration regulations
    3. Training on maintenance and upkeep of testing machines
    4. Training on calibration and verification of testing machines.

Training Program

Part 1 Theoretical Course Training

Construction and classification of testing machines
define
concept
term

Daily maintenance of the testing machine
Fault handling
Common faults

Calibration/verification of force, displacement, velocity, deformation, etc

Manual control box
Protect
Selection and use of fixtures
Selection and use of electronic extensometers
The use of large deformation systems
Attachment high-temperature furnace, environmental box, low-temperature tank
Software operation

Microcomputer controlled electronic universal testing machine
Microcomputer controlled electronic torsion testing machine
Pendulum impact testing machine
Microcomputer-controlled electro-hydraulic amine universal testing machine
Micro computer controlled electro-hydraulic servo pressure testing machine
Reinforcement bending testing machine
Hot deformation Vicat softening point testing machine
Hydrostatic testing machine
Fully automatic dumbbell prototype

Testing Machine Standards
GB/T 16491 Electronic Universal Testing Machine
GB/T 3808 Pendulum Impact Testing Machine
GB/T 16826 Electrohydraulic Servo Universal Testing Machine, etc
Test Method Standards
GB/T 228.1 Metallic Materials Tensile Testing Part 1: Room Temperature Test Method
GB/T 104o-1 Determination of tensile properties of plastics
GB/T 10128 Test Method for Room Temperature Torsion of Metallic Materials
GB/T 229 Charpy pendulum impact test method for metallic materials, etc.
Verification regulations for testing machines
Verification regulation of JJG 475 electronic universal testing machine
Verification regulation of JJG 269 electronic torsion testing machine
Verification regulation of JJG 145 pendulum impact testing machine
JJG 139 Verification Regulations for Tension, Pressure, and Universal Testing Machines, etc.

Part 2: On site operation drill of the testing machine

Guided by company technical personnel on site, real-time operation, and trainees have zero distance contact with the operation process of the testing machine.
The students personally practice and the instructor provides real-time guidance.
Lecturer guidance and feedback, pointing out errors in a timely manner, and keeping in mind the experimental operation process.

Part 3 Completion Assessment

Assessment of learning outcomes will be arranged at the end of the course.
The trainees who pass the assessment will be awarded a training qualification certificate.
Unqualified students will receive another round of free learning.
+86-574-86160555

Scan and follow